operation schedule

英 [ˌɒpəˈreɪʃn ˈʃedjuːl] 美 [ˌɑːpəˈreɪʃn ˈskedʒuːl]

网络  作业排序; 操作程序; 椎程序; 作业程序表; 运行计划; 工作进度表

经济



双语例句

  1. For simplicity, this sub-process only contains one task, here converted into a Call Operation Action called Create a Schedule Definition for the Batch.
    出于简单性的考虑,这个子处理过程只包含一个任务,此处被转化到一个被称为“为Batch创建一个Schedule定义”的CallOperationAction(调用操作活动)。
  2. Evaluation Indicator System and Method of Rapid Cargo Train Operation Schedule
    快捷货物列车开行方案评价指标体系与方法
  3. Operation sheet lightning remains on schedule.
    闪电覆盖行动仍在准备中。
  4. Daily schedule zone refers to the train operation schedule zone outside the adjustment schedule zone, where it is possible to make manual or automatic adjustment.
    日班计划区是调整计划区以外的列车运行计划区域,可以进行人工或自动调整。
  5. The operation of the original schedule arrangement can be executed ahead of time if the odour experiment goes smoothly.
    如果气味实验顺利,原来计划的日程可以提前。
  6. I need to fit a fourth operation into his schedule.
    我得在他的工作表后再加第四个手术。
  7. On the basis of communication operation schedule for system matrix formed with basis cycle, the time synchronization of system was obtained depending on the net time unit ( NTU).
    传输操作时刻表由基循环组成的系统矩阵为基础,时间间隔尺度以网络时间单元为单位实现时间同步。
  8. In the construction, the large construction disturbance has been solved by some advanced methods so that it guarantees the power generator of the project to be put into operation on schedule.
    施工中用先进方法解决了施工干扰大等问题,从而保证了工程按期发电。
  9. In this thesis, static and dynamic coordination models on operation of Urban Rail and Bus System have been proposed from the perspective of operation schedule and real-time dispatching.
    本文从运营计划和动态调度两方面开展,建立实现轨道交通与常规公交运营组织协调的动、静态模型。
  10. Operation Schedule and Load Dispatch of Combined Cycle Generating Unit: Modeling, Solution by Heuristic Genetic Algorithm and Data Processing
    联合循环机组运行计划和负荷分配:建模、启发式遗传算法求解和数据处理
  11. It is the construction, operation objective, operation manner and the operation schedule that introduced in the article to offer valuable experiences for the South-to-North Water Transfer ( SNWT) Project.
    对加利福尼亚州水道工程的建设、运行目标、运行方式及调度模型等方面进行了介绍,以期为南水北调工程提供借鉴。
  12. The key problem of designing the operation schedule for public transit lines is to determining the departing time interval.
    编制车辆的运行时刻表的关键问题是确定发车间隔。
  13. To provide data for optimum operation schedule analyses of the sluice, the relationship of the impact forces acting on the side wall of the gate and the running speed is studied;
    根据浮箱门启闭速度与门体和岸墙之间撞击力大小的关系,选择合理的动力设备,为设计和工程实践提供可靠依据;
  14. Application of Synthetical Fuzzy Judgement to the Programing of Operation Schedule by a Microcomputer in a Printing and Dyeing Mill
    模糊综合评判法在用微机编制印染厂生产作业计划中的应用
  15. Thirdly, the paper researches the making process of control, analyzes the contend and specific operation of schedule control, analyzes the contend and ordinary mode of cost control and change control, gives the outline of the mode of control in software development project management.
    在此基础上,论文分析了软件开发项目进度控制、成本控制、变更控制的具体操作过程和方法,总结性地提出了软件开发项目控制的一般模式。
  16. Switching Logic Based Graphics and Operation Schedule List Auto Generation System for Power Systems
    基于开关逻辑的电力系统图形和操作票自动生成系统
  17. The construction sequences for the powerhouse are very complicated as a result of its huge size and tight time requirements. A good construction design, therefore, could be the prerequisite to ensure an orderly construction and operation on schedule.
    三峡左岸电站厂房规模宏大,施工工序繁杂,要求的施工工期紧张,切实做好施工设计,是保障其有序施工和按期投产的先决条件。
  18. Main equipments and operation schedule for producing tire cord steel in Shagang are described.
    介绍了沙钢生产帘线钢的主要设备及工艺操作规程。
  19. The effects of pre-operative interview are affected by work load, operation schedule, nurse's talent and coordination between the Operating Room and the clinical wards.
    访视效果与手术室工作量、排班方式、手术室护士素质以及手术室与病房工作协调运转有关。
  20. Dissects the characteristics, structure, operation and schedule principle of μ C/ OS-ⅱ, modified the kernel, and improves dependability of the schedule algorithm;
    深刻剖析了μC/OS-Ⅱ的特点、内核结构、运作机理、调度算法,在此基础上对其内核进行移植前的必要修改,并对其调度算法进行了可靠性改进;
  21. This paper discusses the method for optimization of GPS operation schedule by linear programming.
    讨论了用线性规划法进行GPS作业优化的方法。
  22. Chapter 2 presents the characteristic of aviation schedule control, and analyses the input, output and operation flow of schedule control system;
    第二章:总结了航空项目进度控制的主要特征,深入分析了航空项目进度控制体系的输入、输出及其控制操作的一般流程;
  23. Optimization of GPS Operation Schedule Using Linear Programming
    线性规划法进行GPS作业优化
  24. Now, the establishment of remote video surveillance system, which content is the operation of schedule on duty, is an important measure guarantees safety of railway traffic.
    当前,建立以车站调度人员作业情况为内容的远程视频监控系统是保证铁路运输安全的重要措施。
  25. In the operation of electricity market, high-speed and accurate load forecasting is helpful to arrange the operation and the repair schedule of generating units economically and properly and is also of great help to the safety and stability of electrical network.
    在电力市场运营中,快速、准确的负荷预测有助于经济合理的安排电网内部发电机组的启停,维持电网运行的安全稳定,合理安排机组的检修计划。
  26. When the reservoir release and plant-based power are determined, the plant-based operation region schedule is obtained by solving a recursive Dynamic Programming process constrained by the requirements for the plant-based start-up and shutdown frequency and duration.
    在水库出库和电站出力确定的基础上,考虑电站开停机次数和持续时间约束,采用动态规划求得电站的运行区域计划。
  27. Only when we have a deep knowledge of the laws of passengers flow, would we find out an appropriate transit operation and schedule in a scientific way.
    只有对公交客流规律有了深入的了解,才能做出科学合理的公交运营规划和调度。
  28. For a single crane, how to decide operation sequence and schedule crane for minimizing a given objective, it is a practical optimal problem.
    对于单吊机,在给定搬运任务的情况下,如何确定吊机的搬运顺序和时间调度,使得给定的目标最小,是一个实际的优化问题。
  29. Correlation analysis shows that the model is reasonable. ( 4) Dynamic programming model about economic operation of a multi-stage pumping station, which has no water diversion between each stage, is established, and the optimum operation schedule of pumping stations is also given.
    相关性分析表明,提出的预测模型是合理的。(4)梯级泵站经济运行研究。建立了级间无分水任务的一梯级泵站经济运行的动态规划数学模型,给出了优化调度图。
  30. However, wind power has characteristics of randomness and intermittence. Large-scale wind generation connected to power grid has adverse effect on stable operation and generator schedule of the power system.
    然而风能具有随机性和间歇性特点,大规模并网后势必会对系统的安全稳定运行和经济调度带来一定的影响。